Before you start
How to read this report
This is a report for deciding, not just for knowing. Every chapter follows the same line of reasoning, so that any reader, from senior management to maintenance, arrives at a concrete decision.
The decision logic of each chapter
A maintenance decision is only a good one when it starts from the origin of the problem, quantifies the implication with verifiable numbers and ends in a concrete step. That is why every chapter goes through the same six stages.
1OriginWhere the problem starts: the failure mode, the mechanism, the root cause.
2ExpectationWhat the plant assumes today, often without having checked.
3ImplicationWhat it costs, in hours, euros and risk. With the numbers of those who paid.
4EvidenceWhat the sources show: studies, insurers, annual reports, theses.
5PositioningThe criteria for deciding: which asset, which technique, how often.
6Next stepThe next concrete step, one that can be taken next week.
In the chapters on assets, each block ends with who decides: senior management, production, maintenance, finance and risk management. A maintenance decision that has no owner in each of these roles does not survive the first budget.
The rules we followed
- Evidence, not opinion. Every number has a public, numbered source that the reader can open.
- We say what the source says, and then what we conclude. We do not reproduce third-party texts; we summarise, quote sparingly and give the page when we have it.
- When two studies disagree, we show both. Disagreement is information too.
- No data, no invention. Where there is no reliable public source, we say so. The numbers that circulate without an origin are in Annex C, with an explanation of why we did not use them.
- We classify every source by type. A vendor study is not worth the same as an insurer's statistic. The label appears on every reference:
OfficialStandardInsurerTechnical associationAcademicCompanyPressConsultancy / analystVendor
Three reading paths
Executive summary
Twelve conclusions
Each conclusion leads to the evidence. The sources are at the end of each sentence and in the bibliography.
01 · ReportingThe planned is counted to the euro. The unplanned almost never.
In the 2024 annual reports of sixteen listed European companies, only three put a value on a breakdown. Planned shutdowns, by contrast, appear to the euro, quarter after quarter.
Chapter 3 →
02 · InsurersThe stoppage costs more than the machine.
The average business interruption loss is 39% higher than the direct damage. For large transformers, 43% of the loss was downtime.
Chapter 2 →
03 · Global figuresThe most quoted figures come from vendors, and some are not even from industry.
The famous $260,000 per hour measures IT systems. The "11% of revenue" rests on 56 interviews.
Chapter 1 →
04 · Inside the plantsPlants do not know the failures they have.
Three academic studies, in two Portuguese plants, found incomplete failure records. On a single line of a wood yard, 1,061 hours of downtime in one year.
Chapter 4 →
05 · MotorsMotor failure rates vary tenfold between sites.
In the EPRI study of power plants, more than 90% of failures were concentrated in 54% of the sites. The difference lay in how they were operated and maintained.
Chapter 6 →
06 · MotorsBetween a fifth and a half of motor failures are electrical.
And two thirds of failures were detected with the motor in service, not during maintenance or testing.
Chapter 6 →
07 · TransformersReplacing a large transformer now takes 30 to 60 months.
In 2010 it took 5 to 16 months. The price has risen by about 75% in real terms. The cost of a failure has become mainly a matter of time.
Chapter 8 →
08 · RiskPlanned shutdowns break things too.
25% of large breakdown losses happened after a repair or at start-up. Insurers and annual reports tell the same story.
Chapter 2 →
09 · TechniquesNo technology sees everything.
Every technique has documented blind spots. The literature converges on the complementarity of electrical and mechanical signals.
Chapter 14 →
10 · RenewablesIn wind, converter and generator account for about 29% of downtime.
More than the gearbox. And Spain has the oldest wind fleet in Europe.
Chapter 11 →
11 · MaturityOnly 6% of heavy process industry has predictive maintenance in place.
Almost two thirds of the companies surveyed in central Europe inspect visually or with a portable instrument. And 77% say it is hard to hire maintenance staff.
Chapter 22 →
12 · DecisionThe only downtime cost that matters is your plant's.
We propose a six-component formula to calculate it per asset, using the plant's own numbers.
Chapter 23 →
Part I
The cost of downtime
How much does a stoppage that was not in the plan cost? The question seems simple. The answer is scattered across vendor studies, insurance claims, footnotes in annual reports and master's dissertations. This part brings the five sources together and shows what each one is worth.
Chapter 1
The global figures and what they are worth
For fifteen years the market has been repeating half a dozen figures on the cost of downtime. We went back to the source of each one. Some hold up. Others measure something else.
Between 2010 and 2024 at least nine studies were published with global figures on the cost of unplanned downtime and the value of predictive maintenance. These are the figures that appear in sales presentations, articles and proposals. The table shows the origin, the type of source and the sample behind each one.
| Year | Study | What it says | Sample and method | Reading |
| 2010 | US DOE / FEMP, O&M best practices guide1 | Predictive saves 8–12% over preventive and more than 30–40% over reactive. Preventive saves 12–18% over reactive. | US government technical guide (pp. 5.3–5.4) | Public anchor |
| 2016 | Aberdeen Group2 | 260,000 dollars per hour of downtime (164,000 in 2014) | Survey on the availability of virtualised IT systems | Measures IT, not plants |
| 2017 | McKinsey3 | Predictive reduces downtime by 30–50% and extends useful life by 20–40% | Generic statement, no published sample | Consulting experience |
| 2017 | Deloitte4 | Poor maintenance strategies reduce productive capacity by 5–20% | The accompanying figure of 50 billion dollars a year comes from an article sponsored by a vendor | Partly recycled |
| 2017 | ServiceMax / Vanson Bourne5 | 82% of companies had at least one unplanned outage in three years | 600 respondents | Vendor |
| 2021 | Senseye, The True Cost of Downtime6 | 864 billion dollars a year, 8% of the revenues of the 500 largest companies | Survey and extrapolation | Vendor |
| 2022 | Siemens, The True Cost of Downtime6 | Almost 1.5 trillion dollars, 11% of revenues. Automotive: 2 million dollars per hour. Oil and gas: around 500,000. FMCG: 39,000. | 56 interviews, extrapolated to the 500 largest companies | Vendor, small sample |
| 2023 | ABB, Value of Reliability7 | 125,000 dollars per hour (median). More than two thirds have outages at least once a month. 21% still run to failure. | 3,215 maintenance decision-makers, 11 sectors | Largest sample |
| 2024 | Siemens, The True Cost of Downtime8 | 1.4 trillion dollars, 11% of revenues. Automotive up to 2.3 million dollars per hour. 25 incidents and 27 hours lost per month in a large plant (42 and 39 in 2019). | Same extrapolation logic; read through the AEMT summary, original not consulted | Vendor |
Annual cost of downtime at the 500 largest companies, according to the Senseye/Siemens series
2021USD 864bn · 8%
2022~1.5 trillion · 11%
20241.4 trillion · 11%
A vendor's series, with small samples and extrapolation. Useful as an order of magnitude, not as a measurement.6,8
Cost of one hour of downtime by sector
Automotive (2024)up to USD 2.3M
Oil and gas (2022)~USD 500k
Industrial median (2023)USD 125k
FMCG (2022)USD 39k
The same hour can be worth anything from tens of thousands to millions. That is why the average is no basis for a decision.6,8,7
What these figures are worth
Three observations emerge from reading the original sources.
First, almost all of them come from those who sell solutions. Siemens, ABB and ServiceMax are vendors. There is nothing wrong with that, but the reader should know. The 2022 Siemens series, which gave rise to the "11% of revenues", rests on 56 online interviews, extrapolated to 500 companies on the basis of the number of plants and employees.6
Second, the most cited figure of all does not come from industry. Aberdeen's 260,000 dollars per hour comes from a 2016 report on the availability of virtualised IT systems.2 It has been circulating for almost ten years as "the average cost of one hour of downtime in manufacturing".
Third, the list of benefits that appears in almost every presentation has an unsourced origin. "Tenfold return, 70–75% fewer breakdowns, 35–45% less downtime, 20–25% more production" appears in the US Department of Energy's 2010 guide, presented as the result of "independent surveys" that the guide itself does not identify.1 This is very probably where the figures attributed to Deloitte and dozens of vendors come from; we did not find them on Deloitte's current page.4
What we concludeThe global figures are useful to show the order of magnitude: unplanned downtime costs large companies several percentage points of revenue. They are no basis for a decision. The only measure that decides is the cost per hour of each plant's critical asset, calculated with that plant's own figures.
The predictive maintenance market
IoT Analytics, the research firm we used as our reference, estimates the global predictive maintenance market at 5.5 billion dollars in 2022, growing 17% a year to 14.3 billion in 2028. According to the same study, 95% of adopters report a positive return and 27% recovered their investment in less than a year.9 Other firms publish much higher figures that diverge from one another; we did not use them.
1OriginThe figures in circulation were produced by those who sell solutions and recycled without the source.
2Expectation"The market already knows what downtime costs." It does not: it knows an average that applies to no one.
3ImplicationA business case built on a recycled figure falls at a CFO's first question.
4EvidenceAberdeen measures IT. Siemens 2022 rests on 56 interviews. The FEMP list has no source.
5PositioningUse the global figures as an order of magnitude. Use insurers (Chapter 2) as independent evidence.
6Next stepCalculate the cost per hour of the plant's most critical asset using the formula in Chapter 23.
Chapter 2
What insurers pay out
Insurers do not sell maintenance. They pay for breakdowns. That is why their figures are the most independent evidence there is on the real cost of downtime.
Allianz: downtime costs more than the machine
Since 2015 Allianz has published analyses of its commercial claims. Three editions give a series spanning a decade.
| Edition | Period and sample | What it says about machinery breakdown |
| 201510 | 2010–2014 · more than 1,800 large business interruption claims, more than 3.2 billion dollars, 68 countries | Machinery breakdown is the 3rd cause of business interruption losses. Average claim above 2.4 million dollars. |
| 201811 | 2013–2018 · 471,326 claims, 58.1 billion euros | Machinery breakdown: 5% of value. Faulty workmanship or maintenance: 8% of value, the 3rd cause. In energy, machinery breakdown accounts for 10% of claims and faulty workmanship or maintenance for 11% of value. Average business interruption loss: 3.1 million euros, against 2.2 million of direct damage. |
| 202212 | 2017–2021 · more than 530,000 claims, 88.7 billion euros | Machinery breakdown is the 5th cause, with 5% of total value. |
Average loss per claim, Allianz 2013–2018
Business interruption€3.1M
Equipment damage€2.2M
The loss from downtime is 39% higher than the direct damage.11
In 2026, in Allianz's annual risk survey of 970 managers, business interruption fell to 3rd global risk (29% of responses), and the conversation is dominated by geopolitics and supply chains.13 Equipment breakdown does not even appear in the discussion. It is a faithful picture of the problem: the risk that is paid for every year is the one least discussed.
FM Global: 232 large losses in a single year
In July 2019, FM Global released its analysis of the large claims of 2018, above 3 million dollars and excluding natural catastrophes.14
28%of the value of large losses across all industries came from equipment breakdown (65 of 232 claims).
62%of those breakdowns had lack of maintenance as a factor. Another news report on the same analysis speaks of two thirds.
25%of breakdown losses occurred after a repair or at start-up.
43%had operator training deficiencies among the factors. About half had a strong human component.
The sectors with a rising trend over the previous five years were pulp and paper, chemicals, electric utilities and mining.14
IMIA: what the insurers' engineers wrote
IMIA is the International Association of Engineering Insurers. Its working groups publish technical studies on the machines that cost the most in claims. We read six.
Power transformers
IMIA WGP 33 · Bartley (HSB) · 200315
- Sample
- 94 failures of transformers of 25 MVA or more, 1997–2001.
- What it says
- Losses of 286.6 million dollars: 163.2 in damage and 123.4 in downtime (43%). Insulation failure is the 1st cause (24 cases, 150 million). Average age at failure: 18 years. Among industrial transformers, 18 failures and 55.9 million, around 3.1 million each.
- Limitation
- 15 failures of "unknown" cause, totalling 29.8 million. Improper maintenance appears in only 5 cases and 3.5 million: the unknown has three times as many cases and eight times the value.
Electrical failures
IMIA WGP 110 · 201816
- What it says
- Citing Munich Re, 75% of electrical system failures are attributable to human error, including inadequate or deferred maintenance (p. 12). 25% come from improper connections (p. 18). Deteriorated insulation failed at an average age of 17.8 years (p. 17). Citing IEEE statistics, preventive maintenance can reduce the risk of unscheduled downtime by up to 66% (p. 23).
- Case
- Step-up transformer in Asia: 12 million dollars for replacement plus 3 million to repair the low-voltage connections.
Steam turbines
IMIA WGP 42 · 200517
- What it says
- The most frequent event is loss of lubricating oil, in turbines of 10 to 400 MW (p. 27). Low-pressure blades are the largest source of unavailability. A process turbine out of service can cost up to 1 million dollars a day in revenue (pp. 37–38).
- Risk
- Rubbing of new seals after an overhaul or at start-up continues to cause forced outages (p. 9).
Pulp and paper
IMIA WGP 49 · 200618
- Cases
- Broken guide roll in the dryer section: 6.5 million dollars and 15 days down (p. 36). Paper machine bearing that destroyed gears: 3.5 million (p. 35). Recovery boiler explosion: 57 million and 4 months (p. 35). Fire caused by a short circuit at a tissue mill: 128 million (p. 39).
- Recommendation
- Insurers' checklists call for vibration monitoring on conveyor bearings, thermography, oil analysis and acoustic emission.
Ageing and maintenance
IMIA WGP 111 · 201819
- Position
- Maintenance should preferably be predictive or condition-based, and insurers should not be seen as the risk management plan (p. 4).
- Case
- Hydroelectric power station: cables disturbed during routine maintenance broke and caught fire. Four months out of service, a loss of 230 million dollars, of which 75 million was borne by the company (p. 15).
- References
- Design life: electrical distribution around 20 years; control and instrumentation 10–15 years (p. 7). An operating temperature 10 °C higher can double corrosion (p. 8).
Combustion turbines
IMIA WGP 64 · 200920
- What it says
- 17 claims analysed, from 2 to 35 million dollars each. Components of origin: rotating blades 42%, stationary 21%, bearings 14%, compressor 12% (p. 22).
- Cases
- At a cement plant, dust blocked the cooling: 27 million. Control system failure with overspeed: 35 million. Cooling air valves left closed after preventive maintenance (p. 26).
The start-up risk: planned shutdowns break things too
This was the finding we were not looking for. Six independent sources tell the same story: a significant share of breakdowns originates in a planned intervention.
| Source | What happened |
| FM Global, 2018 | 25% of large breakdown losses occurred after a repair or at start-up.14 |
| IMIA, steam turbines | Rubbing of new seals after an overhaul or at start-up.17 |
| IMIA, combustion turbines | Cooling valves left closed after preventive maintenance.20 |
| IMIA, ageing | Cables broken during routine maintenance: 230 million dollars.19 |
| EPRI, motors | 26.8% of large motor failures attributed to the workmanship of the manufacturer or the repairer.21 |
| The Navigator Company, 2024 | Problems with a generator turbine after the scheduled maintenance shutdown, in the same quarter as a failure of a supply transformer.22 |
What we concludeThe planned shutdown is the moment when the most people touch the most machines in the least time. Measuring the condition of critical assets before the shutdown and at start-up turns the first hour of operation into a check rather than a gamble.
1OriginEquipment breakdown is recurrent, and part of it originates in maintenance itself.
2Expectation"Insurance covers it." It covers the damage, with a deductible and a waiting period. It does not cover the lost margin or the lost customer.
3ImplicationDowntime is worth 39% more than the damage. In one IMIA case, a third of the loss stayed with the company.
4EvidenceAllianz (three editions), FM Global (232 claims), IMIA (six studies).
5PositioningThe insurers themselves recommend condition-based maintenance. The authority comes from those who pay.
6Next stepTake the critical-asset monitoring plan to the risk manager and the insurer. It is an argument at policy renewal.
ManagementAccepts the residual risk.
Risk managementNegotiates the policy and deductibles.
MaintenanceProves the condition of the assets.
FinanceCompares premium, deductible and the cost of monitoring.
You have read about 20% of the report
Read the full report
The full edition has 25 chapters in five parts, six annexes and 142 public sources. Tell us who you are and we will send it to your email.
- Part I · The cost of downtime: what listed companies report, inside Portuguese plants
- Part II · Asset casebook: motors, generators, transformers, turbines, pumps, wind and hydro
- Part III · Diagnostic techniques: what each one sees and what it misses
- Part IV · Sectors: pulp and paper, cement, steel, chemicals, energy, water
- Part V · Deciding: the cost of an hour of downtime, the business case and a 5-question test for your plant
SourcesSources cited in this preview
Numbering follows the full report, which cites 142 sources.
- 1Official US DOE / FEMP (PNNL), O&M Best Practices Guide, Release 3.0, ch. 5, 2010. open source ↗
- 2Consultancy / analyst Aberdeen Group, Maintaining Virtual System Uptime in Today's Transforming IT Infrastructure, 2016 (cited in ServiceMax/Vanson Bourne, After the Fall). open source ↗
- 3Consultancy / analyst McKinsey & Company, Manufacturing: Analytics unleashes productivity and profitability, 2017. open source ↗
- 4Consultancy / analyst Deloitte, Predictive maintenance and the smart factory, 2017. open source ↗
- 5Vendor ServiceMax / Vanson Bourne, After the Fall, 2017. open source ↗
- 6Vendor Siemens (Senseye), The True Cost of Downtime 2022, published in 2023. open source ↗
- 7Vendor ABB Motion Services, Value of Reliability, Sapio Research survey, 2023 (via Reliabilityweb). open source ↗
- 8Vendor Siemens, The True Cost of Downtime 2024, via AEMT. open source ↗
- 9Consultancy / analyst IoT Analytics, Predictive Maintenance & Asset Performance Market Report 2023–2028. open source ↗
- 10Insurer Allianz Global Corporate & Specialty, Global Claims Review: Business Interruption in Focus, 2015 (via Insurance Journal). open source ↗
- 11Insurer Allianz Global Corporate & Specialty, Global Claims Review 2018. public document, no direct link
- 12Insurer Allianz Global Corporate & Specialty, Global Claims Review 2022. open source ↗
- 13Insurer Allianz Commercial, Allianz Risk Barometer 2026: Business interruption. open source ↗
- 14Insurer FM Global, analysis of large losses in 2018, released in July 2019 (via PBN and Business Insurance). open source ↗
- 15Insurer IMIA WGP 33 (03), W. H. Bartley (HSB), An Analysis of Transformer Failures, 2003. open source ↗
- 16Insurer IMIA WGP 110 (18), Electrical Failures, 2018. open source ↗
- 17Insurer IMIA WGP 42 (05), Maintenance and Overhaul of Steam Turbines, 2005. open source ↗
- 18Insurer IMIA WGP 49 (06), Hazards in Paper and Pulp Industries, 2006. open source ↗
- 19Insurer IMIA WGP 111 (18), Ageing Plant and Maintenance, 2018. open source ↗
- 20Insurer IMIA WGP 64 (09), Combustion Turbines: Critical Losses and Trends, 2009. open source ↗
- 21Technical association EPRI, motor reliability study in power plants (EL-2678), 1983, as interpreted by H. W. Penrose (MotorDoc, consultant). open source ↗
- 22Company The Navigator Company, Relatório e Contas 2024 [Annual Report 2024], notes to the consolidated financial statements, p. 390. open source ↗