Predictive Maintenance ReportThe invisible stoppage: what industry measures, what it ignores and how to decide

Letter from the CEO

Since Enging was founded in 2011, we have followed the world of predictive maintenance closely.

We started with electrical signature analysis of motors, generators and transformers. Today, as part of the Dynamox Group, we combine that analysis with vibration and temperature, and we monitor industrial assets in 52 countries.

Over these years, one question came up in almost every plant we visited: how much did the last stoppage that wasn't in the plan cost? Rarely could anyone answer.

This report grew out of that question. We went to the sources, from the oldest to the most recent: reliability studies that still underpin the industry today, insurers' reports, statistics from European associations, annual reports of listed companies and dissertations written by engineers inside Portuguese plants. We organised it all to support one decision: where, how and when to measure.

We produced this work because we believe the market has much to gain from this knowledge. All the data is public and every number has its source.

I hope you find it useful.

Marco FerreiraCEO · Enging · Dynamox Group
Marco Ferreira, CEO of EngingMarco Ferreira, CEO

Industry measures the stoppages it plans down to the last euro, and almost never the ones it doesn't. Many failures cannot be seen with a single technology. And the planned shutdown itself is one of the moments of highest risk.

142sources cited, all public and identified
1978–2026from the origin of the P-F curve to the most recent fleet studies
25chapters in 5 parts, plus 6 annexes
13dissertations carried out inside plants and laboratories
100%
public

All the data in this report is public. It comes from annual reports, market announcements, standards, insurer and association publications, official statistics, scientific papers and open-access university theses. Nothing is confidential. Every number has an identified source. How we collected the data

Read by sector

Choose your sector to see only what this report says about it.

Before you start

How to read this report

This is a report for deciding, not just for knowing. Every chapter follows the same line of reasoning, so that any reader, from senior management to maintenance, arrives at a concrete decision.

The decision logic of each chapter

A maintenance decision is only a good one when it starts from the origin of the problem, quantifies the implication with verifiable numbers and ends in a concrete step. That is why every chapter goes through the same six stages.

1Origin

Where the problem starts: the failure mode, the mechanism, the root cause.

2Expectation

What the plant assumes today, often without having checked.

3Implication

What it costs, in hours, euros and risk. With the numbers of those who paid.

4Evidence

What the sources show: studies, insurers, annual reports, theses.

5Positioning

The criteria for deciding: which asset, which technique, how often.

6Next step

The next concrete step, one that can be taken next week.

In the chapters on assets, each block ends with who decides: senior management, production, maintenance, finance and risk management. A maintenance decision that has no owner in each of these roles does not survive the first budget.

The rules we followed

  • Evidence, not opinion. Every number has a public, numbered source that the reader can open.
  • We say what the source says, and then what we conclude. We do not reproduce third-party texts; we summarise, quote sparingly and give the page when we have it.
  • When two studies disagree, we show both. Disagreement is information too.
  • No data, no invention. Where there is no reliable public source, we say so. The numbers that circulate without an origin are in Annex C, with an explanation of why we did not use them.
  • We classify every source by type. A vendor study is not worth the same as an insurer's statistic. The label appears on every reference:

OfficialStandardInsurerTechnical associationAcademicCompanyPressConsultancy / analystVendor

Three reading paths

Executive summary

Twelve conclusions

Each conclusion leads to the evidence. The sources are at the end of each sentence and in the bibliography.

01 · Reporting

The planned is counted to the euro. The unplanned almost never.

In the 2024 annual reports of sixteen listed European companies, only three put a value on a breakdown. Planned shutdowns, by contrast, appear to the euro, quarter after quarter.

Chapter 3 →
02 · Insurers

The stoppage costs more than the machine.

The average business interruption loss is 39% higher than the direct damage. For large transformers, 43% of the loss was downtime.

Chapter 2 →
03 · Global figures

The most quoted figures come from vendors, and some are not even from industry.

The famous $260,000 per hour measures IT systems. The "11% of revenue" rests on 56 interviews.

Chapter 1 →
04 · Inside the plants

Plants do not know the failures they have.

Three academic studies, in two Portuguese plants, found incomplete failure records. On a single line of a wood yard, 1,061 hours of downtime in one year.

Chapter 4 →
05 · Motors

Motor failure rates vary tenfold between sites.

In the EPRI study of power plants, more than 90% of failures were concentrated in 54% of the sites. The difference lay in how they were operated and maintained.

Chapter 6 →
06 · Motors

Between a fifth and a half of motor failures are electrical.

And two thirds of failures were detected with the motor in service, not during maintenance or testing.

Chapter 6 →
07 · Transformers

Replacing a large transformer now takes 30 to 60 months.

In 2010 it took 5 to 16 months. The price has risen by about 75% in real terms. The cost of a failure has become mainly a matter of time.

Chapter 8 →
08 · Risk

Planned shutdowns break things too.

25% of large breakdown losses happened after a repair or at start-up. Insurers and annual reports tell the same story.

Chapter 2 →
09 · Techniques

No technology sees everything.

Every technique has documented blind spots. The literature converges on the complementarity of electrical and mechanical signals.

Chapter 14 →
10 · Renewables

In wind, converter and generator account for about 29% of downtime.

More than the gearbox. And Spain has the oldest wind fleet in Europe.

Chapter 11 →
11 · Maturity

Only 6% of heavy process industry has predictive maintenance in place.

Almost two thirds of the companies surveyed in central Europe inspect visually or with a portable instrument. And 77% say it is hard to hire maintenance staff.

Chapter 22 →
12 · Decision

The only downtime cost that matters is your plant's.

We propose a six-component formula to calculate it per asset, using the plant's own numbers.

Chapter 23 →
Part I

The cost of downtime

How much does a stoppage that was not in the plan cost? The question seems simple. The answer is scattered across vendor studies, insurance claims, footnotes in annual reports and master's dissertations. This part brings the five sources together and shows what each one is worth.

Chapter 1

The global figures and what they are worth

For fifteen years the market has been repeating half a dozen figures on the cost of downtime. We went back to the source of each one. Some hold up. Others measure something else.

Between 2010 and 2024 at least nine studies were published with global figures on the cost of unplanned downtime and the value of predictive maintenance. These are the figures that appear in sales presentations, articles and proposals. The table shows the origin, the type of source and the sample behind each one.

YearStudyWhat it saysSample and methodReading
2010US DOE / FEMP, O&M best practices guide1Predictive saves 8–12% over preventive and more than 30–40% over reactive. Preventive saves 12–18% over reactive.US government technical guide (pp. 5.3–5.4)Public anchor
2016Aberdeen Group2260,000 dollars per hour of downtime (164,000 in 2014)Survey on the availability of virtualised IT systemsMeasures IT, not plants
2017McKinsey3Predictive reduces downtime by 30–50% and extends useful life by 20–40%Generic statement, no published sampleConsulting experience
2017Deloitte4Poor maintenance strategies reduce productive capacity by 5–20%The accompanying figure of 50 billion dollars a year comes from an article sponsored by a vendorPartly recycled
2017ServiceMax / Vanson Bourne582% of companies had at least one unplanned outage in three years600 respondentsVendor
2021Senseye, The True Cost of Downtime6864 billion dollars a year, 8% of the revenues of the 500 largest companiesSurvey and extrapolationVendor
2022Siemens, The True Cost of Downtime6Almost 1.5 trillion dollars, 11% of revenues. Automotive: 2 million dollars per hour. Oil and gas: around 500,000. FMCG: 39,000.56 interviews, extrapolated to the 500 largest companiesVendor, small sample
2023ABB, Value of Reliability7125,000 dollars per hour (median). More than two thirds have outages at least once a month. 21% still run to failure.3,215 maintenance decision-makers, 11 sectorsLargest sample
2024Siemens, The True Cost of Downtime81.4 trillion dollars, 11% of revenues. Automotive up to 2.3 million dollars per hour. 25 incidents and 27 hours lost per month in a large plant (42 and 39 in 2019).Same extrapolation logic; read through the AEMT summary, original not consultedVendor

Annual cost of downtime at the 500 largest companies, according to the Senseye/Siemens series

2021USD 864bn · 8%
2022~1.5 trillion · 11%
20241.4 trillion · 11%

A vendor's series, with small samples and extrapolation. Useful as an order of magnitude, not as a measurement.6,8

Cost of one hour of downtime by sector

Automotive (2024)up to USD 2.3M
Oil and gas (2022)~USD 500k
Industrial median (2023)USD 125k
FMCG (2022)USD 39k

The same hour can be worth anything from tens of thousands to millions. That is why the average is no basis for a decision.6,8,7

What these figures are worth

Three observations emerge from reading the original sources.

First, almost all of them come from those who sell solutions. Siemens, ABB and ServiceMax are vendors. There is nothing wrong with that, but the reader should know. The 2022 Siemens series, which gave rise to the "11% of revenues", rests on 56 online interviews, extrapolated to 500 companies on the basis of the number of plants and employees.6

Second, the most cited figure of all does not come from industry. Aberdeen's 260,000 dollars per hour comes from a 2016 report on the availability of virtualised IT systems.2 It has been circulating for almost ten years as "the average cost of one hour of downtime in manufacturing".

Third, the list of benefits that appears in almost every presentation has an unsourced origin. "Tenfold return, 70–75% fewer breakdowns, 35–45% less downtime, 20–25% more production" appears in the US Department of Energy's 2010 guide, presented as the result of "independent surveys" that the guide itself does not identify.1 This is very probably where the figures attributed to Deloitte and dozens of vendors come from; we did not find them on Deloitte's current page.4

What we conclude

The global figures are useful to show the order of magnitude: unplanned downtime costs large companies several percentage points of revenue. They are no basis for a decision. The only measure that decides is the cost per hour of each plant's critical asset, calculated with that plant's own figures.

The predictive maintenance market

IoT Analytics, the research firm we used as our reference, estimates the global predictive maintenance market at 5.5 billion dollars in 2022, growing 17% a year to 14.3 billion in 2028. According to the same study, 95% of adopters report a positive return and 27% recovered their investment in less than a year.9 Other firms publish much higher figures that diverge from one another; we did not use them.

1Origin

The figures in circulation were produced by those who sell solutions and recycled without the source.

2Expectation

"The market already knows what downtime costs." It does not: it knows an average that applies to no one.

3Implication

A business case built on a recycled figure falls at a CFO's first question.

4Evidence

Aberdeen measures IT. Siemens 2022 rests on 56 interviews. The FEMP list has no source.

5Positioning

Use the global figures as an order of magnitude. Use insurers (Chapter 2) as independent evidence.

6Next step

Calculate the cost per hour of the plant's most critical asset using the formula in Chapter 23.

Chapter 2

What insurers pay out

Insurers do not sell maintenance. They pay for breakdowns. That is why their figures are the most independent evidence there is on the real cost of downtime.

Allianz: downtime costs more than the machine

Since 2015 Allianz has published analyses of its commercial claims. Three editions give a series spanning a decade.

EditionPeriod and sampleWhat it says about machinery breakdown
2015102010–2014 · more than 1,800 large business interruption claims, more than 3.2 billion dollars, 68 countriesMachinery breakdown is the 3rd cause of business interruption losses. Average claim above 2.4 million dollars.
2018112013–2018 · 471,326 claims, 58.1 billion eurosMachinery breakdown: 5% of value. Faulty workmanship or maintenance: 8% of value, the 3rd cause. In energy, machinery breakdown accounts for 10% of claims and faulty workmanship or maintenance for 11% of value. Average business interruption loss: 3.1 million euros, against 2.2 million of direct damage.
2022122017–2021 · more than 530,000 claims, 88.7 billion eurosMachinery breakdown is the 5th cause, with 5% of total value.

Average loss per claim, Allianz 2013–2018

Business interruption€3.1M
Equipment damage€2.2M

The loss from downtime is 39% higher than the direct damage.11

In 2026, in Allianz's annual risk survey of 970 managers, business interruption fell to 3rd global risk (29% of responses), and the conversation is dominated by geopolitics and supply chains.13 Equipment breakdown does not even appear in the discussion. It is a faithful picture of the problem: the risk that is paid for every year is the one least discussed.

FM Global: 232 large losses in a single year

In July 2019, FM Global released its analysis of the large claims of 2018, above 3 million dollars and excluding natural catastrophes.14

28%of the value of large losses across all industries came from equipment breakdown (65 of 232 claims).
62%of those breakdowns had lack of maintenance as a factor. Another news report on the same analysis speaks of two thirds.
25%of breakdown losses occurred after a repair or at start-up.
43%had operator training deficiencies among the factors. About half had a strong human component.

The sectors with a rising trend over the previous five years were pulp and paper, chemicals, electric utilities and mining.14

IMIA: what the insurers' engineers wrote

IMIA is the International Association of Engineering Insurers. Its working groups publish technical studies on the machines that cost the most in claims. We read six.

Power transformers

IMIA WGP 33 · Bartley (HSB) · 200315
Sample
94 failures of transformers of 25 MVA or more, 1997–2001.
What it says
Losses of 286.6 million dollars: 163.2 in damage and 123.4 in downtime (43%). Insulation failure is the 1st cause (24 cases, 150 million). Average age at failure: 18 years. Among industrial transformers, 18 failures and 55.9 million, around 3.1 million each.
Limitation
15 failures of "unknown" cause, totalling 29.8 million. Improper maintenance appears in only 5 cases and 3.5 million: the unknown has three times as many cases and eight times the value.

Electrical failures

IMIA WGP 110 · 201816
What it says
Citing Munich Re, 75% of electrical system failures are attributable to human error, including inadequate or deferred maintenance (p. 12). 25% come from improper connections (p. 18). Deteriorated insulation failed at an average age of 17.8 years (p. 17). Citing IEEE statistics, preventive maintenance can reduce the risk of unscheduled downtime by up to 66% (p. 23).
Case
Step-up transformer in Asia: 12 million dollars for replacement plus 3 million to repair the low-voltage connections.

Steam turbines

IMIA WGP 42 · 200517
What it says
The most frequent event is loss of lubricating oil, in turbines of 10 to 400 MW (p. 27). Low-pressure blades are the largest source of unavailability. A process turbine out of service can cost up to 1 million dollars a day in revenue (pp. 37–38).
Risk
Rubbing of new seals after an overhaul or at start-up continues to cause forced outages (p. 9).

Pulp and paper

IMIA WGP 49 · 200618
Cases
Broken guide roll in the dryer section: 6.5 million dollars and 15 days down (p. 36). Paper machine bearing that destroyed gears: 3.5 million (p. 35). Recovery boiler explosion: 57 million and 4 months (p. 35). Fire caused by a short circuit at a tissue mill: 128 million (p. 39).
Recommendation
Insurers' checklists call for vibration monitoring on conveyor bearings, thermography, oil analysis and acoustic emission.

Ageing and maintenance

IMIA WGP 111 · 201819
Position
Maintenance should preferably be predictive or condition-based, and insurers should not be seen as the risk management plan (p. 4).
Case
Hydroelectric power station: cables disturbed during routine maintenance broke and caught fire. Four months out of service, a loss of 230 million dollars, of which 75 million was borne by the company (p. 15).
References
Design life: electrical distribution around 20 years; control and instrumentation 10–15 years (p. 7). An operating temperature 10 °C higher can double corrosion (p. 8).

Combustion turbines

IMIA WGP 64 · 200920
What it says
17 claims analysed, from 2 to 35 million dollars each. Components of origin: rotating blades 42%, stationary 21%, bearings 14%, compressor 12% (p. 22).
Cases
At a cement plant, dust blocked the cooling: 27 million. Control system failure with overspeed: 35 million. Cooling air valves left closed after preventive maintenance (p. 26).

The start-up risk: planned shutdowns break things too

This was the finding we were not looking for. Six independent sources tell the same story: a significant share of breakdowns originates in a planned intervention.

SourceWhat happened
FM Global, 201825% of large breakdown losses occurred after a repair or at start-up.14
IMIA, steam turbinesRubbing of new seals after an overhaul or at start-up.17
IMIA, combustion turbinesCooling valves left closed after preventive maintenance.20
IMIA, ageingCables broken during routine maintenance: 230 million dollars.19
EPRI, motors26.8% of large motor failures attributed to the workmanship of the manufacturer or the repairer.21
The Navigator Company, 2024Problems with a generator turbine after the scheduled maintenance shutdown, in the same quarter as a failure of a supply transformer.22
What we conclude

The planned shutdown is the moment when the most people touch the most machines in the least time. Measuring the condition of critical assets before the shutdown and at start-up turns the first hour of operation into a check rather than a gamble.

1Origin

Equipment breakdown is recurrent, and part of it originates in maintenance itself.

2Expectation

"Insurance covers it." It covers the damage, with a deductible and a waiting period. It does not cover the lost margin or the lost customer.

3Implication

Downtime is worth 39% more than the damage. In one IMIA case, a third of the loss stayed with the company.

4Evidence

Allianz (three editions), FM Global (232 claims), IMIA (six studies).

5Positioning

The insurers themselves recommend condition-based maintenance. The authority comes from those who pay.

6Next step

Take the critical-asset monitoring plan to the risk manager and the insurer. It is an argument at policy renewal.

ManagementAccepts the residual risk.
Risk managementNegotiates the policy and deductibles.
MaintenanceProves the condition of the assets.
FinanceCompares premium, deductible and the cost of monitoring.
You have read about 20% of the report

Read the full report

The full edition has 25 chapters in five parts, six annexes and 142 public sources. Tell us who you are and we will send it to your email.

  • Part I · The cost of downtime: what listed companies report, inside Portuguese plants
  • Part II · Asset casebook: motors, generators, transformers, turbines, pumps, wind and hydro
  • Part III · Diagnostic techniques: what each one sees and what it misses
  • Part IV · Sectors: pulp and paper, cement, steel, chemicals, energy, water
  • Part V · Deciding: the cost of an hour of downtime, the business case and a 5-question test for your plant
Your sector
What brings you to this report?

Fill in every field, with your company email, to send.

Sources

Sources cited in this preview

Numbering follows the full report, which cites 142 sources.

  1. 1Official US DOE / FEMP (PNNL), O&M Best Practices Guide, Release 3.0, ch. 5, 2010. open source ↗
  2. 2Consultancy / analyst Aberdeen Group, Maintaining Virtual System Uptime in Today's Transforming IT Infrastructure, 2016 (cited in ServiceMax/Vanson Bourne, After the Fall). open source ↗
  3. 3Consultancy / analyst McKinsey & Company, Manufacturing: Analytics unleashes productivity and profitability, 2017. open source ↗
  4. 4Consultancy / analyst Deloitte, Predictive maintenance and the smart factory, 2017. open source ↗
  5. 5Vendor ServiceMax / Vanson Bourne, After the Fall, 2017. open source ↗
  6. 6Vendor Siemens (Senseye), The True Cost of Downtime 2022, published in 2023. open source ↗
  7. 7Vendor ABB Motion Services, Value of Reliability, Sapio Research survey, 2023 (via Reliabilityweb). open source ↗
  8. 8Vendor Siemens, The True Cost of Downtime 2024, via AEMT. open source ↗
  9. 9Consultancy / analyst IoT Analytics, Predictive Maintenance & Asset Performance Market Report 2023–2028. open source ↗
  10. 10Insurer Allianz Global Corporate & Specialty, Global Claims Review: Business Interruption in Focus, 2015 (via Insurance Journal). open source ↗
  11. 11Insurer Allianz Global Corporate & Specialty, Global Claims Review 2018. public document, no direct link
  12. 12Insurer Allianz Global Corporate & Specialty, Global Claims Review 2022. open source ↗
  13. 13Insurer Allianz Commercial, Allianz Risk Barometer 2026: Business interruption. open source ↗
  14. 14Insurer FM Global, analysis of large losses in 2018, released in July 2019 (via PBN and Business Insurance). open source ↗
  15. 15Insurer IMIA WGP 33 (03), W. H. Bartley (HSB), An Analysis of Transformer Failures, 2003. open source ↗
  16. 16Insurer IMIA WGP 110 (18), Electrical Failures, 2018. open source ↗
  17. 17Insurer IMIA WGP 42 (05), Maintenance and Overhaul of Steam Turbines, 2005. open source ↗
  18. 18Insurer IMIA WGP 49 (06), Hazards in Paper and Pulp Industries, 2006. open source ↗
  19. 19Insurer IMIA WGP 111 (18), Ageing Plant and Maintenance, 2018. open source ↗
  20. 20Insurer IMIA WGP 64 (09), Combustion Turbines: Critical Losses and Trends, 2009. open source ↗
  21. 21Technical association EPRI, motor reliability study in power plants (EL-2678), 1983, as interpreted by H. W. Penrose (MotorDoc, consultant). open source ↗
  22. 22Company The Navigator Company, Relatório e Contas 2024 [Annual Report 2024], notes to the consolidated financial statements, p. 390. open source ↗